Logo

Additional works – rampart at Jakšić tower

Blog

PE “Belgrade Fortress” will continue the conservation and restoration work on the part of the ramparts near Jaksic Tower (Phase 2 of the half-bastion III of the Eastern Front of the Belgrade Fortress).

Additional works will ensure the static stability of the wall and solve the problem of water collection and proper drainage.